Custom orders ship in 7–10 working days. That figure is often quoted without saying what it measures, so here is the whole sequence.

Submission — same day

You choose a fabric, select styles and enter quantities by size, then submit. Nothing is manufactured and nothing is charged. The request lands with our team immediately.

Quote — usually within one working day

The team prices each line against the fabric you chose, calculates shipping to your destination, applies your volume discount and sends the quote. If something in the request will not work in production, this is when you hear about it — before there is a price to argue with.

Approval — your call

The clock does not start until you approve. A quote can sit unapproved for as long as you need; approving it creates the order and releases it to the factory. This is deliberate — no buyer should have production running against a figure they have not agreed.

Production — 7 to 10 working days

Cutting, construction, boning, finishing and quality check. This is genuine make time, not a queue estimate, because a custom order is cut to your specification rather than picked from a shelf. Bespoke patterns sit at the longer end while the pattern is graded and test-cut.

Dispatch

Goods ship from our factory in Gurgaon, India. Transit time on top of production depends on destination and service — quoted with your order rather than assumed.

What moves the number

  • Bespoke patterns add pattern work before the cut, which is why they carry a higher minimum and sit at the longer end of the range.
  • Fabric availability. Everything in the library is an active fabric, but a very large single-colour run can exceed what is on hand and need a fresh lot.
  • Approval delay. The most common cause of a "slow" custom order is a quote sitting unapproved. Production cannot start before it.

Planning backwards

For a seasonal drop, work back from your on-shelf date: transit, plus 7–10 working days production, plus a day for quoting, plus your own approval time. Submitting three weeks out is comfortable. Submitting one week out is not.

Start a custom order →

lead timeproductioncustom corsetsmanufacturingwholesale

Factory-Direct Wholesale

Ready to Source Factory-Direct?

View our latest collections with transparent wholesale pricing. MOQ from USD 400. Ships worldwide.